Timmins, Ontario. Melkior Resources Inc. (“Melkior”) is pleased to announce that assay results confirm the existence of strata-bound sulphide mineralization within mafic volcanic rock on the Maseres Project. Assay results from the strata bound, sulphide mineralized horizon returned maximum values of: Copper: 2,040 ppm Lead:125 ppm Zinc: 130 ppm Silver: 4.3 ppm Gold: […]
Monthly Archives: October 2018
Timmins, Ontario / TheNewswire / October 24 2018 – Melkior Resources Inc. (“Melkior”) is publishing two AVI files depicting Maseres Project resistivity information, they are available at: https://www.melkior.com/depth-slice https://www.melkior.com/south-north Melkior has previously released this resistivity information in the form of depth slices and sections prepared by Geotech for the 2018 VTEM survey in previous news […]
October 16, 2018 / TheNewswire / Timmins, Ontario – Melkior Resources Inc. (“Melkior”) has received a report “Geophysical Overview of the VTEM dataset Maseres Project” prepared by Sharpe Geophysical Solutions. The report is available at https://www.melkior.com/Maseres-report.pdf. Interested parties are encouraged to print the Sharpe Geophysical Solutions report and study it. Consistent with bedrock observed on the Maseres Project […]
October 15, 2018 / TheNewswire / Timmins, Ontario – Melkior Resources Inc. (“Melkior”) (TSXV:MKR) would like to provide the following update to the Maseres Project as there have been several requests for photographs of the area described in Melkiors News Release of October 5, 2018. Interested parties are invited to go to https://www.melkior.com/Maseres/MineralizedOutcrop to view a set of photographs taken […]
TIMMINS, Ontario, Oct. 12, 2018 (GLOBE NEWSWIRE) — Melkior Resources Inc. (“Melkior”) (TSX-V: MKR) would like to release updated soil chemistry maps for the initial cummulative 1562 soil samples from the Maseres Project. The following links present colour contoured maps for those elementals with the highest correlation to the principal commodities being sought, overlying a […]
Timmins, Ontario / TheNewswire / October 9, 2018 – Melkior Resources Inc. (“Melkior”) would like to discuss one of the results of a reconnaissance and prospecting trip to the White Lake Project (Hemlo Area) that was made in September 2018. Four days were spent evaluating access, prospecting and reconnaissance mapping in several areas of […]
Timmins, Ontario. Melkior Resources Inc. (“Melkior”) would like to provide the following update to the Maseres Project as it could be interpreted as being “Material”. Ground truthing of VTEM EM anomalies on the Maseres Project has encountered strata-bound sulphide mineralization within volcanic stratigraphy. Two similar outcrops of strata-bound sulphide mineralization within volcanic stratigraphy have been […]