Drilling Highlights: 6.56 g/t Au and 6.3 g/t Ag intersected over 1.8 metres (drilled width) in drill hole MKR-14-03 including 39.2 g/t Au and 36.3 g/t Ag over 0.3 metres approximately 38 metres vertically below surface Melkior identifies 1.5 kilometres of potential gold mineralization from Zam Zam deposit to the Lake Shore Gold claim […]
Tag Archives: Drill Results
Ottawa,Ontario.Melkior Resources Inc. (“Melkior”) (TSX.V: MKR; OTCPK: MKRIF; FSE: MEK) is providing results for a channel sampling program undertaken in June 2014 and the remaining three holes drilled in January 2014 on Zone 75. The drilling revealed continuous mineralization hosted in a granite with a strong albite alteration; previously reported intersections include 4.04 g/t gold […]
Ottawa, Ontario. Melkior Resources Inc. (“Melkior”) (TSX.V: MKR; OTCPK: MKRIF; FSE: MEK) is providing results for five holes drilled in December 2013 on Zone 75, totaling 594 metres, on its Launay Gold Project in Québec. The main objective of the drill program is to determine a near-surface resource on Zone 75. The drilling continues to […]
Ottawa, Ontario. Melkior Resources Inc. (“Melkior”) (TSX.V: MKR; OTCPK: MKRIF; FSE: MEK) is providing results for the final nine holes drilled in November 2013 on its Carscallen Gold Project in Timmins, Ontario. The results continue to demonstrate the consistency and continuity of the gold rich ZamZam zone to a vertical depth of 80 to 115 […]
Ottawa, Ontario. Melkior Resources Inc. (“Melkior”) (TSX.V: MKR; OTCPK: MKRIF; FSE: MEK) is providing results for three holes drilled in December 2013 on Zone 75, totaling 357 metres, on its Launay Gold Project. Table 1 displays the best results. The drill program is funded by Beaufield Resources Inc. per an option and joint venture agreement […]
Ottawa, Ontario – January 13, 2014 – Melkior Resources Inc. (“Melkior”) (TSX.V: MKR; OTCPK: MKRIF; FSE: MEK) is providing results for the first eight holes drilled, totaling 939 metres, on its Launay Gold Project, located due northwest of Val d’Or, Quebec. Assay results for eight diamond drill holes, LAY-11-2013 to LAY-17-2013 and LAY-19-2013, were received […]
Ottawa, Ontario. Melkior Resources Inc.(TSX.V – MKR) (“Melkior”) is pleased to announce results from the first six holes of fifteen holes from its current drill program. These six holes include gold intersections of 1.50 metres of 34.06 g/t gold and of 0.65 metres of 40.4 g/t gold (see Table 1 below for complete results). The […]
OTTAWA, ONTARIO – Melkior Resources Inc. (TSXV – MKR) (“Melkior”) is pleased to announce the beginning of its fall drill program at the 100% owned Carscallen Gold Project in Timmins, Ontario. The drill program consists of a series of holes to extend and close off the gold mineralization on the ZamZam zone to define a […]
OTTAWA, ONTARIO – Melkior Resources Inc. (TSXV – MKR) (“Melkior”) is pleased to announce that it has received positive gold metallurgical results from its Initial Metallurgical Study for the Carscallen Gold Project in Timmins, Ontario. A composite of mineralized samples from the ZamZam zone was sent to Activation Laboratories for preliminary metallurgic testing to assess […]
OTTAWA, ONTARIO – Melkior Resources Inc. (TSXV – MKR) (“Melkior”) is pleased to announce that it has received positive gold metallurgical results from its Initial Metallurgical Study for the Launay Gold Project in the Abitibi, Quebec. A composite of mineralized samples from Zone 75 at Melkior’s Launay property was sent to Activation Laboratories for preliminary […]